Monday, October 7, 2013
Day 17
Today, is the seventeenth work day of the remodel. The tile is complete in master bedroom and 2 bathrooms. Today, the stacked stone veneer is being installed on the face of the fireplace. I am hoping that the major work will be completed by the end of the week.

Thursday, October 3, 2013
Color and tile
My house is starting to look more like a home. The wall are painted and the new baseboards were installed. I decided to have blue as an accent wall in my new office area and in my master bedroom. Blue is probably my all time most favorite color. Today, the tile started to be laid, I was really excited to see the tile in my master bedroom. I will have the look of wood floor but with the easy cleaning and maintenance.



Tuesday, October 1, 2013
Lucie's Heart Quilt
I have slowly been going through boxes of stuff in my garage and I found a quilt top sewn by Lucie circa 1988. Lucie had pieced the entire log cabin heart but the tulip appliqué was not done. I machine appliquéd the tulips using fabric from my stash. The logs are 3/4" wide. I just need to make a label. The quilt is from the book Holiday Happenings by Christal Carter. Machine quilted by Jessica Gamez.

Saturday, September 28, 2013
Remodel update
The new ceiling in the great room is up and textured. Can lights were tested out with bulbs. Wow, I am going to have some light in my great room. Today, saw cuts were made in the living room slab so I can have some in-floor electrical receptacles. Monday, painting will begin. I just have to make a firm decision about the colors.



Wednesday, September 25, 2013
Lead in The Holidays
I was asked to make a quilt for Leader Dog for the Blind, Lead in the Holidays silent auction to be held November 22, 2013. Tonight I finished sewing on the binding and attaching the quilt label. The quilt, called Ruff Around the Edges, was designed by Karen Brow, Java House Quilts. The dogs were machine appliquéd with Floriani embroidery thread. The custom machine quilting was done by Jessica Jones Gamez.



Monday, September 23, 2013
Demo day one
Today was the first demo day. Carpet was removed from the living room and master bedroom. Tile was removes from entry way and family room. The dust is just unbelievable.

Friday, September 20, 2013
Construction has begun
I have been thinking of redoing the flooring in my great room and master bedroom. The thought of doing such a huge space has always caused me to rethink the idea. In August, I was referred by a friend to Diane Drummond of Moon Valley Interiors and so the snowball started down the mountain. I think today is officially day one of my 2013 remodel experience. I survived and so did the girls. These last 3 weeks have been a whirlwind of decision making but I think that most the decisions have been. Now it is time to watch my home be transformed through the extraordinary efforts of Diane Drummond and my talented team of contractors.
Today, the electricians began cutting the existing ceiling to install can lights and ceiling fan.

Katie inspecting the work and Katie and Molly playing after being restricted from some of the house for most of the day.


Monday, the removal of all the tile and carpet begins. My plan is to keep you posted on the construction process.
Today, the electricians began cutting the existing ceiling to install can lights and ceiling fan.

Katie inspecting the work and Katie and Molly playing after being restricted from some of the house for most of the day.


Monday, the removal of all the tile and carpet begins. My plan is to keep you posted on the construction process.