Saturday, September 28, 2013

Remodel update

The new ceiling in the great room is up and textured. Can lights were tested out with bulbs. Wow, I am going to have some light in my great room. Today, saw cuts were made in the living room slab so I can have some in-floor electrical receptacles. Monday, painting will begin. I just have to make a firm decision about the colors.
Preparing ceiling before texturingFilled saw cuts

Wednesday, September 25, 2013

Lead in The Holidays

I was asked to make a quilt for Leader Dog for the Blind, Lead in the Holidays silent auction to be held November 22, 2013. Tonight I finished sewing on the binding and attaching the quilt label. The quilt, called Ruff Around the Edges, was designed by Karen Brow, Java House Quilts. The dogs were machine appliquéd with Floriani embroidery thread. The custom machine quilting was done by Jessica Jones Gamez.
Ruff around the edgesLead in the Holidays label

Monday, September 23, 2013

Demo day one

Today was the first demo day. Carpet was removed from the living room and master bedroom. Tile was removes from entry way and family room. The dust is just unbelievable.
Demo day one

Friday, September 20, 2013

Construction has begun

I have been thinking of redoing the flooring in my great room and master bedroom. The thought of doing such a huge space has always caused me to rethink the idea. In August, I was referred by a friend to Diane Drummond of Moon Valley Interiors and so the snowball started down the mountain. I think today is officially day one of my 2013 remodel experience. I survived and so did the girls. These last 3 weeks have been a whirlwind of decision making but I think that most the decisions have been. Now it is time to watch my home be transformed through the extraordinary efforts of Diane Drummond and my talented team of contractors.
Today, the electricians began cutting the existing ceiling to install can lights and ceiling fan.
Remodel ceiling

Katie inspecting the work and Katie and Molly playing after being restricted from some of the house for most of the day.
Remodel Katie inspectingRemodel Katie and Molly playing

Monday, the removal of all the tile and carpet begins. My plan is to keep you posted on the construction process.

Sunday, September 15, 2013

Quilt labels

I have spent the last week, embroidering quilt labels on my Bernina 780, I always seem to procrastinate about making labels for my quilts, so I really had a lot of labels to make. So far I have finished 9 labels. Now I just have to sew all the labels on the quilts.

I used the
Floriani Total Control Professional embroidery software. I am new to machine embroidery and embroidery software, so making these labels was a great learning experience for me.
quilt labels with frames 5 quilt labels

Sunday, September 1, 2013

Bernina Bonanza

I attended Bernina 830/780 Bonanza at the Bernina Connection. This was a two-day event where we worked on 2 projects. Everyone enjoyed learning embroidery pointers and winning prizes.

Friday night we made a pin cushion. We had a choice of doing embroidery or using the Bernina PaintWorks tool. I decided to make the embroidered pin cushion.
Enter your PIN

Saturday, we worked on the Melford Messenger Bag by Charlie's Aunt. A Bernina educator had adjusted the pattern so we could use some of the embroidery features on the Bernina 830 or 780. I did not finish constructing the entire bag but got an excellent start. The picture shows the embroidery I completed. The top left is the front flap, the bottom left is the front of the bag, right is back of the bag and lining fabric. Endless embroidery was used for the flap embroidery.

Purse parts