Life has been quite hectic. The remodel/construction finished Saturday, October 12, 2013 but the clean up was just beginning. Closets, everything in the kitchen, basically everything in the house needed cleaning. I am beginning to place furniture and rehang everything on my walls. Last Saturday was the first time I was able to stitch on my Bird Dance blocks. Before the remodel began, I was almost finished stitching the August blocks, blocks 22, 23 and 24. Last night, I finished the blocks and placed them on my design wall. It really felt good to do something besides cleaning and organizing. I will really have to concentrate on finishing September, blocks 25, 26, 27 and October blocks 28, 29, and 30.
Today, is the seventeenth work day of the remodel. The tile is complete in master bedroom and 2 bathrooms. Today, the stacked stone veneer is being installed on the face of the fireplace. I am hoping that the major work will be completed by the end of the week.
My house is starting to look more like a home. The wall are painted and the new baseboards were installed. I decided to have blue as an accent wall in my new office area and in my master bedroom. Blue is probably my all time most favorite color. Today, the tile started to be laid, I was really excited to see the tile in my master bedroom. I will have the look of wood floor but with the easy cleaning and maintenance.

I have slowly been going through boxes of stuff in my garage and I found a quilt top sewn by Lucie circa 1988. Lucie had pieced the entire log cabin heart but the tulip appliqué was not done. I machine appliquéd the tulips using fabric from my stash. The logs are 3/4" wide. I just need to make a label. The quilt is from the book Holiday Happenings by Christal Carter. Machine quilted by Jessica Gamez.